Testing and Inspection

During the testing and inspection phase, the following aspects are evaluated:

1. The AC and DC currents are checked for end to end continuity, ensuring that there are no gaps in the wiring of the system and its connectivity.
2. Wiring resistance is checked using a multi-meter.
The testing phase lasts for one week. During the testing phase, various performance assessments which test the efficiency of the solution are carried out.