ENI

Project highlights
client: Eni New Energy Pakistan
location: Bhit Gas Field, Dadu, Sindh, Pakistan
sector:v
solar power project: 10 MW
Download PDF
Share with:

Eni, through its’ subsidiary Eni New Energy Pakistan, partnered with Reon on the 10 MW Solar Power Plant to reduce the employment of gas-fired power turbines by partially shifting the load to Solar Energy, and subsequently reducing carbon emissions.

The single-axis Solar PV plant (42-panels on a single array) has improved the annual energy generation capacity by 15% as compared to a traditional PV plant. The Solar plant created approximately 440 jobs (150 from the local community) during construction and 14 permanent skilled and semi-skilled jobs.

The photovoltaic plant works in full zeal with the existing power generation system of Bhit gas treatment plant and has optimized operational costs with the shutdown of one of the existing gas turbines.

CONNECT WITH US

If you are determined to create energy efficiency and decarbonization for your industry, if you are a technology enthusiast – connect with us or subscribe to our monthly newsletter to stay connected. You can also use the form beneath to submit your enquiry.